SR 528 Miscellaneous Resurfacings
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work consists of providing all labor, materials, equipment, and incidentals necessary to complete the work including but not limited to milling and resurfacing pavement on the CFX System mainlines and ramps SR 528, SR 408, SR 417, signing, pavement markings, pavement widening, grading, guardrail removal, guardrail and miscellaneous asphalt installation SR 414, SR 417, SR 408, SR 528, removal a
- Status
- Closed
- Sector
- Consumer Products, Commercial, Road, Mass Transit, Rail, Manufacturing (Industrial)
- Location
- Orlando, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SR 528 Miscellaneous Resurfacings
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of providing all labor, materials, equipment, and incidentals necessary to complete the work including but not limited to milling and resurfacing pavement on the CFX System mainlines and ramps SR 528, SR 408, SR 417, signing, pavement markings, pavement widening, grading, guardrail removal, guardrail and miscellaneous asphalt installation SR 414, SR 417, SR 408, SR 528, removal and replacement of retroreflective pavement markers SR 408, SR 417, SR 429, SR 453, SR 528 and ins... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Commercial, Road, Mass Transit, Rail, Manufacturing (Industrial) |
Article published date | 2024-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
