logo

SR 53 @ SR 124 IN BRASELTON

Sector: Cement • Location: Braselton, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

SR 3 @ SR 124 in Braselton: Intersection of SR 53 and Davis St, Braselton, Jackson County, GA. The project will include the construction of brick paver and concrete sidewalks, brick plaza space, terraced area will trellis shade structure, landscaping, and non-breakaway pedestrian lighting. The project is approximately 0.09 miles long, consisting of two separate areas, the northern portion starting

Project Information FAQ

Project Information

4 Q
The project “SR 53 @ SR 124 IN BRASELTON” is an infrastructure initiative in the Cement sector, located in Braselton, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SR 3 @ SR 124 in Braselton: Intersection of SR 53 and Davis St, Braselton, Jackson County, GA. The project will include the construction of brick paver and concrete sidewalks, brick plaza space, terraced area will trellis shade structure, landscaping, and non-breakaway pedestrian lighting. The project is approximately 0.09 miles long, consisting of two separate areas, the northern portion starting at the northern end of PI#0009097, running north along SR 53, then turning east along Old Davis St, and tying into the proposed Braselton Town Green project. Old Davis St will be modified to a one-way entrance only driveway from SR 53. The southern piece of this project will begin 100’ east of the intersection of Davis St and SR 53 and encompass the area between Davis St and the back of the Braselton Brothers Store, and tying into the Town Green project on its eastern side. No ROW is anticipated. Irrigation is proposed.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data