SR 54 @ SR 138
Construction work program · Georgia
Source: Georgia Department of Transportation (GDOT)
The proposed improvements involve providing exclusive westbound and southbound right turn lanes and dual eastbound left turn lanes. The westbound right turn lane will be achieved by a combination of lane narrowing and shifting to the south, with minimal widening required to the north. Similarly, the additional eastbound left turn lane will be achieved by a combination of lane narrowing and s
- Status
- Under Construction
- Sector
- Road
- Location
- Jonesboro, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 54 @ SR 138
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed improvements involve providing exclusive westbound and southbound right turn lanes and dual eastbound left turn lanes. The westbound right turn lane will be achieved by a combination of lane narrowing and shifting to the south, with minimal widening required to the north. Similarly, the additional eastbound left turn lane will be achieved by a combination of lane narrowing and shifting to the south. The existing exclusive eastbound right turn lane will be converted into a shared thru-right lane. The southbound right turn lane will be achieved by a combination of lane narrowing and shifting to the east. None of the proposed improvements are expected to impact right-of-way. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Jonesboro |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
