SR 56 FROM SR 178 TO SR 4
Sector: Road • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project is the milling, leveling and resurfacing of SR 279. This section of SR 279 needs resurfacing because the existing pavement is deteriorating. SR 279 was last resurfaced in 1999.
- Status
- Closed
- Sector
- Road, Government, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 56 FROM SR 178 TO SR 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is the milling, leveling and resurfacing of SR 279. This section of SR 279 needs resurfacing because the existing pavement is deteriorating. SR 279 was last resurfaced in 1999. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government, Manufacturing (Industrial) |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
