logo

SR 57 OVER THE OCONEE RIVER @ WASHINGTON COUNTY LINE

Sector: Water Supply and Storage • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project consists of the replacement of the structurally deficient and functionally obsolete bridge on SR 57 over the Oconee River at the Washington - Wilkinson County line. The proposed typical section is comprised of one 12-ft travel lane in each direction with 10-ft rural shoulders. SR 57 will be realigned in order to construct the new 44-ft. wide reinforced concrete bridge while traffic is

Project Information FAQ

Project Information

3 Q
The project “SR 57 OVER THE OCONEE RIVER @ WASHINGTON COUNTY LINE” is an infrastructure initiative in the Water Supply and Storage sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the replacement of the structurally deficient and functionally obsolete bridge on SR 57 over the Oconee River at the Washington - Wilkinson County line. The proposed typical section is comprised of one 12-ft travel lane in each direction with 10-ft rural shoulders. SR 57 will be realigned in order to construct the new 44-ft. wide reinforced concrete bridge while traffic is maintained on the existing roadway. Once the new bridge and approaches are constructed, traffic will be diverted to the new alignment and the existing bridge removed. The roadbed will remain in place, however, the asphalt will be obliterated and removed. Guardrail will be installed on both sides of SR 57 due to the high fill sections required in order to obtain proper vertical separation with the river water flood stage elevations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data