logo
ProjectComplete

SR 59 @ GROVE CREEK

Sector: Commercial • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

The proposed project will be to remove the existing SR 59 bridge over Grove Creek and build a new bridge in its place. The proposed length of the project is 0.13 miles with new bridge being approx. 281 ft long and 40 ft wide. It is located in Banks County, 5.0 miles north of Commerce. The offsite detour is approximately 11.2 miles from one side of the bridge to the other, utilizing SR 59, SR 15, I

Status
Closed
Sector
Commercial, Bridge, Power Transmission, Government, Power Generation (CCGT)
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 59 @ GROVE CREEK

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 59 @ GROVE CREEK” is an infrastructure initiative in the Commercial sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project will be to remove the existing SR 59 bridge over Grove Creek and build a new bridge in its place. The proposed length of the project is 0.13 miles with new bridge being approx. 281 ft long and 40 ft wide. It is located in Banks County, 5.0 miles north of Commerce. The offsite detour is approximately 11.2 miles from one side of the bridge to the other, utilizing SR 59, SR 15, I-85 and SR 63. By using an offsite detour alternate we negate the cost of a detour bridge.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Commercial, Bridge, Power Transmission, Government, Power Generation (CCGT)

Article published date

2024-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project