SR 5/SR 515 @ CAMP ROAD
Sector: Road • Location: Jasper, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed improvement would modify the existing signal into a signalized R-CUT. The signalized R-CUT would be constructed to include dual northbound left and dual westbound right turn lanes. The restricted eastbound and westbound left turn and thru movements would be rerouted as right turns to U-turn at the adjacent unsignalized intersections, Whitfield Dr and Hazel Mosley Dr, on SR 515/SR 5
- Status
- Under Construction
- Sector
- Road, Automotive
- Location
- Jasper, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 5/SR 515 @ CAMP ROAD
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed improvement would modify the existing signal into a signalized R-CUT. The signalized R-CUT would be constructed to include dual northbound left and dual westbound right turn lanes. The restricted eastbound and westbound left turn and thru movements would be rerouted as right turns to U-turn at the adjacent unsignalized intersections, Whitfield Dr and Hazel Mosley Dr, on SR 515/SR 5. The proposed northbound and westbound dual turn lanes would provide additional capacity and reduce queue spillback for the movement's high vehicle volumes. Additionally, the proposed signalized RCUT would improve overall intersection safety by reducing conflict points at the intersection. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Jasper |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Automotive |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
