SR 5/SR 515 @ SR 108
Sector: Road • Location: Jasper, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed improvement would provide dual eastbound and westbound left turn lanes, as well as an additional westbound through lane on SR 108. The additional westbound through lane will drop just west of Shelby Lane and will require full depth widening along both the north and south shoulders of SR 108. The proposed dual eastbound and westbound left turn lanes would provide additional capacity
- Status
- Under Construction
- Sector
- Road, Automotive
- Location
- Jasper, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 5/SR 515 @ SR 108
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed improvement would provide dual eastbound and westbound left turn lanes, as well as an additional westbound through lane on SR 108. The additional westbound through lane will drop just west of Shelby Lane and will require full depth widening along both the north and south shoulders of SR 108. The proposed dual eastbound and westbound left turn lanes would provide additional capacity and reduce queue spillback for the movement's high vehicle volumes. The additional eastbound left turn lane would have a storage length of approximately 350’. The additional eastbound left turn lane would have a storage length of approximately 440’. The proposed alternative is a reduced version of the original scoping study (PI 0018286) preferred alternative which also included providing an additional eastbound left turn lane. The analysis showed that while the additional eastbound lane does provide some additional benefit, majority of the intersection delay improvements are coming from |
Location
Country | United States of America (USA) |
State | Georgia |
City | Jasper |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Automotive |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
