SR 5/US 1 Resurfacing, Restoration, and Rehabilitation
Sector: Road • Location: Boca Raton, Florida, United States
Source: Boca News Now
Construction on this 1.137-mile resurfacing, restoration, and rehabilitation project from Bailey Street in Boca Raton to south of Eve Street in Delray Beach began on December 13, 2024. Work includes milling and repaving the existing roadway to ensure long-term resilience; restriping the roadway to provide 11-foot lanes and 6-foot bike lanes in each direction of SR 5/US 1.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Construction on this 1.137-mile resurfacing, restoration, and rehabilitation project from Bailey Street in Boca Raton to south of Eve Street in Delray Beach began on December 13, 2024. Work includes milling and repaving the existing roadway to ensure long-term resilience; restriping the roadway to provide 11-foot lanes and 6-foot bike lanes in each direction of SR 5/US 1. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
