logo

SR 6 @ MAXHAM ROAD

Sector: Cement • Location: Lithia Springs, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed improvement would provide dual westbound right turn lanes on SR 6 and extend the westbound left-turn storage. The additional westbound right lane would provide added capacity and reduce delays for the high volumes executing this movement at the intersection and reduce delays on right turns. The westbound left turn lane storage would be extended to 700 ft of storage, which will reduce

Project Information FAQ

Project Information

4 Q
The project “SR 6 @ MAXHAM ROAD” is an infrastructure initiative in the Cement sector, located in Lithia Springs, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed improvement would provide dual westbound right turn lanes on SR 6 and extend the westbound left-turn storage. The additional westbound right lane would provide added capacity and reduce delays for the high volumes executing this movement at the intersection and reduce delays on right turns. The westbound left turn lane storage would be extended to 700 ft of storage, which will reduce queue spillback that currently blocks the westbound through vehicles. To accommodate the second westbound right-turn lane, the project will widen the roadway to the north of the approach and signalize the movement to overlap with the southbound left-turn movement. Additionally, the extension of the westbound left-turn lane will require widening into the existing concrete median. The right turn improvements will also provide safety benefits by improving the angle of the channelized right turn, which will benefit driver visibility and reduce the likelihood of angle collisions.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data