SR 6 @ SR 100
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
The proposed project consists of a single lane roundabout at the intersection of SR 6 and SR 100/ Canal Street in Polk County. The roundabout is expected to reduce crashes and delay at this intersection. The roundabout is expected to operate more safely and operationally than an all way stop condition based on the Traffic Engineering study.
- Status
- Under Construction
- Sector
- Water Supply and Storage, Road
- Location
- Cedartown, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 6 @ SR 100
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of a single lane roundabout at the intersection of SR 6 and SR 100/ Canal Street in Polk County. The roundabout is expected to reduce crashes and delay at this intersection. The roundabout is expected to operate more safely and operationally than an all way stop condition based on the Traffic Engineering study. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Cedartown |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
