logo

SR 60 @ CHATTAHOOCHEE RIVER IN GAINESVILLE

Sector: Bridge • Location: Gainesville, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project replaces the original SR 60 bridge over the Chattahoochee River/Lake Lanier. The existing two-lane northbound bridge on SR 60/Thompson Bridge Road will be removed and replaced with a new two-lane bridge relocated west of the existing two-lane bridge to be retained southbound on SR 60/Thompson Bridge Road. After construction northbound SR 60/Thompson Bridge Road traffic will be shift

Status
Under Construction
Sector
Bridge, Road
Location
Gainesville, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 60 @ CHATTAHOOCHEE RIVER IN GAINESVILLE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SR 60 @ CHATTAHOOCHEE RIVER IN GAINESVILLE” is an infrastructure initiative in the Bridge sector, located in Gainesville, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Not available for this record.

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project replaces the original SR 60 bridge over the Chattahoochee River/Lake Lanier. The existing two-lane northbound bridge on SR 60/Thompson Bridge Road will be removed and replaced with a new two-lane bridge relocated west of the existing two-lane bridge to be retained southbound on SR 60/Thompson Bridge Road. After construction northbound SR 60/Thompson Bridge Road traffic will be shifted to the existing two-lane bridge and southbound SR 60/Thompson Bridge Road traffic will be shifted to the new alignment two-lane bridge. The proposed structure is approximately 1103 feet long by 39.25 feet wide. This includes two,12-foot travel lanes and eight foot outside rural shoulder and a four foot inside rural shoulder. The total length of the project is approximately 0.72 miles, beginning approximately 0.26 miles south of the existing bridge abutment and ending approximately 0.26 miles north of the existing bridge abutment.

Location

Country

United States of America (USA)

State

Georgia

City

Gainesville

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Bridge, Road

Article published date

2026-04-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project