SR 60 @ CHATTAHOOCHEE RIVER IN GAINESVILLE
Sector: Bridge • Location: Gainesville, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project replaces the original SR 60 bridge over the Chattahoochee River/Lake Lanier. The existing two-lane northbound bridge on SR 60/Thompson Bridge Road will be removed and replaced with a new two-lane bridge relocated west of the existing two-lane bridge to be retained southbound on SR 60/Thompson Bridge Road. After construction northbound SR 60/Thompson Bridge Road traffic will be shift
- Status
- Under Construction
- Sector
- Bridge, Road, Government
- Location
- Gainesville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 60 @ CHATTAHOOCHEE RIVER IN GAINESVILLE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project replaces the original SR 60 bridge over the Chattahoochee River/Lake Lanier. The existing two-lane northbound bridge on SR 60/Thompson Bridge Road will be removed and replaced with a new two-lane bridge relocated west of the existing two-lane bridge to be retained southbound on SR 60/Thompson Bridge Road. After construction northbound SR 60/Thompson Bridge Road traffic will be shifted to the existing two-lane bridge and southbound SR 60/Thompson Bridge Road traffic will be shifted to the new alignment two-lane bridge. The proposed structure is approximately 1103 feet long by 39.25 feet wide. This includes two,12-foot travel lanes and eight foot outside rural shoulder and a four foot inside rural shoulder. The total length of the project is approximately 0.72 miles, beginning approximately 0.26 miles south of the existing bridge abutment and ending approximately 0.26 miles north of the existing bridge abutment. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Gainesville |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Bridge, Road, Government |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States of America
- Centennial Bridge
- Claflin University Connecting Minority Community Project
- ConnectMaine Authority Statewide Broadband Infrastructure Application 2021
- White Earth NTIA Broadband – White Earth Reservation
- Tri-State Fiber Deployment Project (TSFDP)
- OLLU Connecting Minority Communities Pilot
- Strengthening Broadband Capacity to Amplify Educational Opportunities and Foster Digital Inclusion in Rural and Underserved Communities
- Connecting Minds & Technology: Enhancing Cross-Campus Digital Literacy with Hands-on Initiatives (CMT)
