SR 60 FROM N OF BEAR PAW RIDGE TO S OF YAHOOLA CREEK
Sector: Bridge • Location: Dahlonega, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project proposes reconstructing the existing slopes along SR 60/US 19 approximately 2 miles south of the City of Dahlonega in Lumpkin County. Roadway construction is anticipated approximately 750 ft north of the existing Chestatee River bridge on SR 60/US 19 and ending approximately 400 ft south of the existing Yahoola Creek bridge on SR 60/US 19 for a total approximate project length o
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction work program |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project proposes reconstructing the existing slopes along SR 60/US 19 approximately 2 miles south of the City of Dahlonega in Lumpkin County. Roadway construction is anticipated approximately 750 ft north of the existing Chestatee River bridge on SR 60/US 19 and ending approximately 400 ft south of the existing Yahoola Creek bridge on SR 60/US 19 for a total approximate project length of 0.5 miles. The proposed roadway typical section would consist of two 12 ft travel lanes, one in each direction, with 8 ft shoulders (4 ft paved, 4 ft grassed) and rural side ditches. Walls will be required to repair and reduce slope impacts on the west side of the project to protect the Chestatee River and on the east side to reduce slope impacts to the mountainous terrain. The required ROW varies between 130 ft to 190 ft along the centerline of SR 60/US 19. The estimated construction time for this project is 12 months, and an off-site detour is not required. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
