logo

SR 60 FROM SR 400/LUMPKIN TO YELLOW CREEK ROAD/HALL

Sector: Road • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

GDOT project PI 0013762 consists of widening and improvements along State Route 60 in Hall and lumpkin counties Georgia. The project is approximately 4.87 miles starting at the SR 60/SR 400 intersection in Lumpkin County and continuing south to just north of Yellow Creek Road in Hall County. The existing road is a principal arterial (rural) with two lanes for most of the project length. Widening a

Status
Under Construction
Sector
Road, Bridge, Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 60 FROM SR 400/LUMPKIN TO YELLOW CREEK ROAD/HALL

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 60 FROM SR 400/LUMPKIN TO YELLOW CREEK ROAD/HALL” is an infrastructure initiative in the Road sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

GDOT project PI 0013762 consists of widening and improvements along State Route 60 in Hall and lumpkin counties Georgia. The project is approximately 4.87 miles starting at the SR 60/SR 400 intersection in Lumpkin County and continuing south to just north of Yellow Creek Road in Hall County. The existing road is a principal arterial (rural) with two lanes for most of the project length. Widening and improvements along the corridor are required due to congestion issues and high crash rates. There are two bridge culverts within the project limits, one at Long Branch and another at Yellow Creek. The existing right of way varies from 55-ft to 165-ft and required right of way is anticipated throughout the corridor. The design speed of the project will be 55 mph and decreases to 45 mph just north of Yellow Creek Road.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Road, Bridge, Government

Article published date

2025-05-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project