logo

SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project will replace an existing structurally deficient two lane bridge on SR 66 at Crooked Creek, approximately 3.2 miles northwest of Young Harris, Georgia. The project begins approximately 1,383' south of Crooked Creek crossing and ends approximately 1,017' north of Crooked Creek crossing. The construction proposes replacing the existing 120' long by 27.5' wide bridge with a 180' long by 40

Project Information FAQ

Project Information

4 Q
The project “SR 66 @ CROOKED CREEK 3.2 MI NW OF YOUNG HARRIS” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will replace an existing structurally deficient two lane bridge on SR 66 at Crooked Creek, approximately 3.2 miles northwest of Young Harris, Georgia. The project begins approximately 1,383' south of Crooked Creek crossing and ends approximately 1,017' north of Crooked Creek crossing. The construction proposes replacing the existing 120' long by 27.5' wide bridge with a 180' long by 40' wide concrete bridge. The proposed bridge will be constructed approximately 30 feet west of the existing bridge site. Traffic will be maintained during construction of the new bridge and approaches utilizing stage construction. The project total length is 0.45 miles and is located in Land Lots 30 and 43 in Land District 17.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data