logo

SR 67 FM CR 54/OLD SYLVANIA TO CR 218/INDUSTRIAL PARK - TIA

Sector: Car parking • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This project consists of the widening on SR 67 in Millen from CR 54 (Old Sylvania) MP 14.74 to CR 218 (Industrial Park) MP 15.62. The proposed typical section shall consist of one 12-ft. travel lane in each direction with a 14-ft. flush median. The 10'-0" shoulders will consist of curb, gutter and sidewalk on each side. The horizontal and vertical alignments of SR 67 appear to meet current AASH

Status
Closed
Sector
Car parking, Manufacturing (Industrial), Road, Government, Automotive
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 67 FM CR 54/OLD SYLVANIA TO CR 218/INDUSTRIAL PARK - TIA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 67 FM CR 54/OLD SYLVANIA TO CR 218/INDUSTRIAL PARK - TIA” is an infrastructure initiative in the Car parking sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the widening on SR 67 in Millen from CR 54 (Old Sylvania) MP 14.74 to CR 218 (Industrial Park) MP 15.62. The proposed typical section shall consist of one 12-ft. travel lane in each direction with a 14-ft. flush median. The 10'-0" shoulders will consist of curb, gutter and sidewalk on each side. The horizontal and vertical alignments of SR 67 appear to meet current AASHTO Green Book criteria so no realignment or vertical reconstruction appears necessary. The horizontal alignment of CR 54 (Old Sylvania) does not meet the current GDOT requirements of 70 degrees and will have to be realigned or result in a cul-de-sac. All other side streets' and roads' horizontal and vertical alignments meet current AASHTO criteria. Traffic will be maintained on the existing alignments during construction. The posted speed for this portion of SR 67 varies from 35 mph at the beginning of the project to 45 mph at the Chance St intersection where it continues to the end.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Car parking, Manufacturing (Industrial), Road, Government, Automotive

Article published date

2024-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project