SR 67 FM CR 54/OLD SYLVANIA TO CR 218/INDUSTRIAL PARK - TIA
Sector: Car parking • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project consists of the widening on SR 67 in Millen from CR 54 (Old Sylvania) MP 14.74 to CR 218 (Industrial Park) MP 15.62. The proposed typical section shall consist of one 12-ft. travel lane in each direction with a 14-ft. flush median. The 10'-0" shoulders will consist of curb, gutter and sidewalk on each side. The horizontal and vertical alignments of SR 67 appear to meet current AASH
- Status
- Closed
- Sector
- Car parking, Manufacturing (Industrial), Road, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 67 FM CR 54/OLD SYLVANIA TO CR 218/INDUSTRIAL PARK - TIA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the widening on SR 67 in Millen from CR 54 (Old Sylvania) MP 14.74 to CR 218 (Industrial Park) MP 15.62. The proposed typical section shall consist of one 12-ft. travel lane in each direction with a 14-ft. flush median. The 10'-0" shoulders will consist of curb, gutter and sidewalk on each side. The horizontal and vertical alignments of SR 67 appear to meet current AASHTO Green Book criteria so no realignment or vertical reconstruction appears necessary. The horizontal alignment of CR 54 (Old Sylvania) does not meet the current GDOT requirements of 70 degrees and will have to be realigned or result in a cul-de-sac. All other side streets' and roads' horizontal and vertical alignments meet current AASHTO criteria. Traffic will be maintained on the existing alignments during construction. The posted speed for this portion of SR 67 varies from 35 mph at the beginning of the project to 45 mph at the Chance St intersection where it continues to the end. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Manufacturing (Industrial), Road, Government, Automotive |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
