SR 67 FM CR 54/OLD SYLVANIA TO CR 218/INDUSTRIAL PARK - TIA
Sector: Car parking • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project consists of the widening on SR 67 in Millen from CR 54 (Old Sylvania) MP 14.74 to CR 218 (Industrial Park) MP 15.62. The proposed typical section shall consist of one 12-ft. travel lane in each direction with a 14-ft. flush median. The 10'-0" shoulders will consist of curb, gutter and sidewalk on each side. The horizontal and vertical alignments of SR 67 appear to meet current AASH
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of the widening on SR 67 in Millen from CR 54 (Old Sylvania) MP 14.74 to CR 218 (Industrial Park) MP 15.62. The proposed typical section shall consist of one 12-ft. travel lane in each direction with a 14-ft. flush median. The 10'-0" shoulders will consist of curb, gutter and sidewalk on each side. The horizontal and vertical alignments of SR 67 appear to meet current AASHTO Green Book criteria so no realignment or vertical reconstruction appears necessary. The horizontal alignment of CR 54 (Old Sylvania) does not meet the current GDOT requirements of 70 degrees and will have to be realigned or result in a cul-de-sac. All other side streets' and roads' horizontal and vertical alignments meet current AASHTO criteria. Traffic will be maintained on the existing alignments during construction. The posted speed for this portion of SR 67 varies from 35 mph at the beginning of the project to 45 mph at the Chance St intersection where it continues to the end. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
