logo

SR 67 FM I-16 TO STATESBORO BYPASS

Sector: Power Transmission • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Project ST00-0149(030) begins approximately 0.4 miles south of I-16 and extends north to a point south of CR 585 (Burkhalter Road), tying into project STP-149-1(29). The existing 2 lane roadway will be reconstructed to a 4 lane roadway with a 32' divided depressed median (normal) then transition to a 14ft two way left turn lane approximately 200 feet south of CR 585 and continue to the end of the

Project Information FAQ

Project Information

4 Q
The project “SR 67 FM I-16 TO STATESBORO BYPASS” is an infrastructure initiative in the Power Transmission sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Project ST00-0149(030) begins approximately 0.4 miles south of I-16 and extends north to a point south of CR 585 (Burkhalter Road), tying into project STP-149-1(29). The existing 2 lane roadway will be reconstructed to a 4 lane roadway with a 32' divided depressed median (normal) then transition to a 14ft two way left turn lane approximately 200 feet south of CR 585 and continue to the end of the project. The project includes reconstruction of the I-16 ramp intersections and some relocation of the WB Exit ramp. Project Length is approximately 10.86) Typical sections will include 6.5 foot paved shoulders in the rural sections and 4 foot bike lanes will be utilized in the curb and gutter sections of the project. There will be four 5 lane sections consisting of 12 outside lanes, 11 ft. inside lanes, and a 14 ft. flush median. The design speed will be 45 and 55 mph.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data