logo

SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

Project
Complete

Vienna Pedestrian Facilities Phase II: Vienna Downtown Square Business District in Vienna, Dooly County, GA.

  1. SR 7 from CS 723/Church Street to SR 27/Union Street
  2. SR 7 from CS 741/Cotton Street to south of Pennahatchee Creek
  3. CS 741/Cotton Street from SR 7 to 0.01 mile east of SR 7 The proposed project will improve the pedestrian facilities within the City of Vienna in numerous ways
Status
Closed
Sector
Car parking, Road, Cement, Automotive, Government, Manufacturing (Industrial)
Location
Vienna, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA” is an infrastructure initiative in the Car parking sector, located in Vienna, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Vienna Pedestrian Facilities Phase II: Vienna Downtown Square Business District in Vienna, Dooly County, GA. 1. SR 7 from CS 723/Church Street to SR 27/Union Street 2. SR 7 from CS 741/Cotton Street to south of Pennahatchee Creek 3. CS 741/Cotton Street from SR 7 to 0.01 mile east of SR 7 The proposed project will improve the pedestrian facilities within the City of Vienna in numerous ways. Proposed improvements include demolishing and replacing 1260' of sidewalk and replacing with smaller concrete sidewalks that will be edged with new curb and gutter, stamped concrete and tree cut outs along the parking areas. The sidewalks feature handicap improvements that are compliant with ADA regulations. Tree cut outs and the wiring and bases for pedestrian lighting will be installed throughout the project area, and benches and trashcans are possible as additive bids.

Location

Country

United States of America (USA)

State

Georgia

City

Vienna

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Car parking, Road, Cement, Automotive, Government, Manufacturing (Industrial)

Article published date

2025-08-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project