SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
Vienna Pedestrian Facilities Phase II: Vienna Downtown Square Business District in Vienna, Dooly County, GA.
- SR 7 from CS 723/Church Street to SR 27/Union Street
- SR 7 from CS 741/Cotton Street to south of Pennahatchee Creek
- CS 741/Cotton Street from SR 7 to 0.01 mile east of SR 7 The proposed project will improve the pedestrian facilities within the City of Vienna in numerous ways
- Status
- Closed
- Sector
- Car parking, Road, Cement, Automotive, Government, Manufacturing (Industrial)
- Location
- Vienna, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 7 @ 2 LOCS & CS 741/COTTON STREET @ 1 LOC IN VIENNA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vienna Pedestrian Facilities Phase II: Vienna Downtown Square Business District in Vienna, Dooly County, GA. 1. SR 7 from CS 723/Church Street to SR 27/Union Street 2. SR 7 from CS 741/Cotton Street to south of Pennahatchee Creek 3. CS 741/Cotton Street from SR 7 to 0.01 mile east of SR 7 The proposed project will improve the pedestrian facilities within the City of Vienna in numerous ways. Proposed improvements include demolishing and replacing 1260' of sidewalk and replacing with smaller concrete sidewalks that will be edged with new curb and gutter, stamped concrete and tree cut outs along the parking areas. The sidewalks feature handicap improvements that are compliant with ADA regulations. Tree cut outs and the wiring and bases for pedestrian lighting will be installed throughout the project area, and benches and trashcans are possible as additive bids. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Vienna |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Road, Cement, Automotive, Government, Manufacturing (Industrial) |
Article published date | 2025-08-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
