SR 7 & SR 112 @ VAR LOCS IN ASHBURN-UPGRADE TRAFFIC SIGNALS
Sector: Broadband • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
These plans were submitted due to the separation of the above-mentioned project from the Ben Hill & Worth project (STP-0005-00 (927), PI. No.: 005927).
The proposed project would consist of the upgrading of traffic signal equipment at five (5) intersections within the City of Ashburn, Turner County, Georgia. This project would improve the overall efficiency and safety of traffic flow due to u
- Status
- Closed
- Sector
- Broadband, Car parking, Road, Telecommunications, Government, Automotive
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 7 & SR 112 @ VAR LOCS IN ASHBURN-UPGRADE TRAFFIC SIGNALS
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | These plans were submitted due to the separation of the above-mentioned project from the Ben Hill & Worth project (STP-0005-00 (927), PI. No.: 005927). The proposed project would consist of the upgrading of traffic signal equipment at five (5) intersections within the City of Ashburn, Turner County, Georgia. This project would improve the overall efficiency and safety of traffic flow due to upgraded traffic signal displays and state of the art traffic signal control equipment and provide better signal coordination through fiber optic communications cable and improve pedestrian safety with improved crosswalks, pedestrian signals and sidewalk ramps where appropriate. SR 7/Main St. @ SR 112/Washington Ave. SR 7/Main St. @ College St. SR 112/Washington Ave. @ Gordon St. SR 112/Washington Ave. @ Johnson St. College St. @ Gordon St. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Broadband, Car parking, Road, Telecommunications, Government, Automotive |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Broadband projects in United States of America
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- MODIFY EXISTING WIRELESS FACILITY, REMOVE (2) TMA'S, INSTALL (1) RRU , REMOVE (2) DIPLEXERS & UTILITY STANDS, REMOVE (2)
- TEMPORARY USE FOR TEMPORARY FACILITY - CELL SITE ON WHEELS (COW) FOR VERIZON WIRELESS - 67-FEET TALL
- DISH WIRELESS WILL BE PERFORMING A 1ST TIME INSTALL AT AN EX ISTING COMM FACILITY. ADDING 3 ANTENNA AND 6 RRU TO TOP OF T
