logo

SR 7 FROM 4TH ST TO 1ST ST & FROM SR 520 TO POPLAR ST

Sector: Cement • Location: Tifton, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

SR 7 From 4th St to 1st St & From SR 520 to Poplar St: City of Tifton, Tift County, GA. Area A – West side of Main St (200’ north of Poplar St to 200’ south of 5th St), proposed improvements include the construction of 375’ of new 8’ wide sidewalks, 10 landscape islands with street trees next to existing and new sidewalks, 3 new driveway aprons and 800’ of traffic striping. Total length: 950’.

Project Information FAQ

Project Information

4 Q
The project “SR 7 FROM 4TH ST TO 1ST ST & FROM SR 520 TO POPLAR ST” is an infrastructure initiative in the Cement sector, located in Tifton, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SR 7 From 4th St to 1st St & From SR 520 to Poplar St: City of Tifton, Tift County, GA. Area A – West side of Main St (200’ north of Poplar St to 200’ south of 5th St), proposed improvements include the construction of 375’ of new 8’ wide sidewalks, 10 landscape islands with street trees next to existing and new sidewalks, 3 new driveway aprons and 800’ of traffic striping. Total length: 950’. Area B – Commerce Way (from 5th St to E 1st St) and E 3rd St (from Commerce Way to Main St), improvements include 35 landscape islands with street trees, 2400’ of header curb, 2400’ of curb & gutter, 2400 SF of brick pavers for island edging, 180 SY of concrete sidewalks, 40 SY of driveway, and 1160’ of traffic striping. Area C – Love Ave (from Brumby Way to 4th St), proposed improvements include 20 landscape islands with street trees, 1600’ of header curb, 1600’ of curb & gutter, 1600 SF of brick pavers for islands edging, 40 SY of sidewalk, 10 SY of driveway and 290’ of traffic striping

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data