SR 70 @ CR 2036/WESTPARK PLACE
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
This project proposes to improve the intersection of Fulton Industrial Blvd. (State Route 70) at Westpark Place. The left turn lanes on Fulton Industrial Blvd. would be offset to increase sight distances for turning vehicles. A restricted crossing U-turn (RCUT) intersection would be constructed at this location. The scope of work at programming is subject to further analysis.
- Status
- Under Construction
- Sector
- Road, Automotive, Manufacturing (Industrial)
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 70 @ CR 2036/WESTPARK PLACE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project proposes to improve the intersection of Fulton Industrial Blvd. (State Route 70) at Westpark Place. The left turn lanes on Fulton Industrial Blvd. would be offset to increase sight distances for turning vehicles. A restricted crossing U-turn (RCUT) intersection would be constructed at this location. The scope of work at programming is subject to further analysis. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Automotive, Manufacturing (Industrial) |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
