SR 70 FROM SANDY CREEK TO SR 8
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project proposes to provide street scaping improvement long Fulton Industrial Boulevard from the Donald Lee Hollowell and Fulton Industrial Boulevard intersection to Sandy Creek. Improving and connecting side walks within the project limits.
- Status
- Under Construction
- Sector
- Road, Manufacturing (Industrial)
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 70 FROM SANDY CREEK TO SR 8
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project proposes to provide street scaping improvement long Fulton Industrial Boulevard from the Donald Lee Hollowell and Fulton Industrial Boulevard intersection to Sandy Creek. Improving and connecting side walks within the project limits. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Manufacturing (Industrial) |
Article published date | 2026-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
