SR 74/SENOIA ROAD @ I-85 SB ENTRANCE RAMP - RIGHT TURN LN
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Georgia Department of Transportation (GDOT)
The existing right turn lane that accesses the hotel and the Marathon gas station, which terminates at the entrance to City Lake Road, along with the existing entrance and exit belonging to the Phillips 66 gas station, will be merged together in order to allow for a single 12'-0' wide right turn lane which extends from the ramp to approximately 1000 feet north of the ramp. There will be new 30" cu
- Status
- Closed
- Sector
- Hotel, Road, Car parking, Automotive, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 74/SENOIA ROAD @ I-85 SB ENTRANCE RAMP - RIGHT TURN LN
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing right turn lane that accesses the hotel and the Marathon gas station, which terminates at the entrance to City Lake Road, along with the existing entrance and exit belonging to the Phillips 66 gas station, will be merged together in order to allow for a single 12'-0' wide right turn lane which extends from the ramp to approximately 1000 feet north of the ramp. There will be new 30" curb and gutter and 5'-0" sidewalk within the confines of the 16'-" urban shoulder. Right of Way varies from 100 to 320 feet. The existing traffic control consists of a four-way traffic signal and a yield sign for those southbound turning right onto the I-85 South ramp. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Hotel, Road, Car parking, Automotive, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hotel projects in United States of America
- SR 14 FROM SR 18 TO N OF CS 1187/MEDICAL PKWY
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- Brotman Hall (BH) Suite 377 Renovation
- CONVERT (E) MEDICAL UNITS INTO (N) SENIOR CARE FACILITY
- NEW RESIDENCE INN HOTEL (98,208 SQ FT)-93 ROOMS ADD SQ FT/14,980 PARKING GARAGE/7,852- COMMERCIAL
- NEW HOTEL- 4 STORY WOOD CONSTRUCTION BLDG WITH STUCCO FINISH 2 ELEVATORS,OUTDOOR POOL, FITNESS CENTER,MEETING RMS
- Willard InterContinental Hotel
- Westin Arlington Gateway
