logo

SR 76/SR 333 @ CS 834/CRAWFORD ST & CSX #636942L IN QUITMAN

Sector: Road • Location: Quitman, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

This project will replace the existing bridge along SR 76/SR 333 @ CS 834/Crawford St & CSX Railroad in Quitman, Georgia. The new bridge and walls will have four 12-foot lanes, 2-foot gutter and 5.5-foot sidewalk. The approaching roadway will have four 12-foot lanes, variable 0-foot to 12-foot raised and flush median, 2.5-foot curb/gutter and 5-foot sidewalk. The total length of the project is app

Project Information FAQ

Project Information

4 Q
The project “SR 76/SR 333 @ CS 834/CRAWFORD ST & CSX 636942L IN QUITMAN” is an infrastructure initiative in the Road sector, located in Quitman, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project will replace the existing bridge along SR 76/SR 333 @ CS 834/Crawford St & CSX Railroad in Quitman, Georgia. The new bridge and walls will have four 12-foot lanes, 2-foot gutter and 5.5-foot sidewalk. The approaching roadway will have four 12-foot lanes, variable 0-foot to 12-foot raised and flush median, 2.5-foot curb/gutter and 5-foot sidewalk. The total length of the project is approximately 2,000 linear feet. The roadway will be closed for 18 months to construct the new bridge and walls at the same location while the traffic will use a designated offsite detour. Additionally, the road closure is anticipated to impact at least one hurricane season and the total project construction time of 24 months will span two hurricane seasons.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data