SR 78 Lakeport Guardrail Maintenance
Sector: Road • Location: Florida, United States
Source: South Central Florida Life
Crews will be working along the shoulder resetting guardrail on westbound SR 78 between Old Lakeport Road and US 27. Lane closures may be conducted during this operation, expected to be completed by September 2025.
- Status
- Under Construction
- Sector
- Road
- Location
- Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- South Central Florida Life
ConstructChat
Ask ConstructChat about SR 78 Lakeport Guardrail Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crews will be working along the shoulder resetting guardrail on westbound SR 78 between Old Lakeport Road and US 27. Lane closures may be conducted during this operation, expected to be completed by September 2025. |
Location
Country | United States of America (USA) |
State | Florida |
Source
Source | South Central Florida Life |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
