logo

SR 7/SR 127/US 41 @ BIG INDIAN CREEK IN PERRY

Sector: Road • Location: Perry, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project, GDOT P.I. 0015553, located along SR 7/SR The proposed bridge would be constructed south of the existing bridge and parallel to the existing SR 7/SR 127/US 41 alignment while utilizing staged construction to keep traffic open during construction. The profile of the bridge is expected be raised approximately 3.5 feet due to hydraulic requirements. The bridge will consist of fi

Project Information FAQ

Project Information

4 Q
The project “SR 7/SR 127/US 41 @ BIG INDIAN CREEK IN PERRY” is an infrastructure initiative in the Road sector, located in Perry, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project, GDOT P.I. 0015553, located along SR 7/SR The proposed bridge would be constructed south of the existing bridge and parallel to the existing SR 7/SR 127/US 41 alignment while utilizing staged construction to keep traffic open during construction. The profile of the bridge is expected be raised approximately 3.5 feet due to hydraulic requirements. The bridge will consist of five 12-foot lanes (two in each direction and a center turn lane) and 4-foot bike lanes adjacent to the roadway with sidewalks in both directions. The proposed roadway would have a similar typical section consisting of five 12-foot lanes (two lanes in each direction and a center turn lane), with 4-foot bike lanes an urban shoulder and sidewalk on each side. The total project length is approximately 0.3 miles with an approximate construction time of 24 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data