SR 8 - CR 15 Sanitary Sewer and Water Main Extension
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Project includes the following Work: The project includes but is not limited to the extension of existing water and sanitary sewer utilities north of the intersection of State Road 8 and County Road 15. The work includes installation of approximately 1,100 LF of water main, 3 fire hydrants, 1,340 LF of sanitary force main, 50 LF of sanitary gravity sewer, highway crossings (jack and bore), a l
- Status
- Closed
- Sector
- Water Supply and Storage, Raw Materials, Road, Government, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial
- Location
- Garrett, Indiana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SR 8 - CR 15 Sanitary Sewer and Water Main Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project includes the following Work: The project includes but is not limited to the extension of existing water and sanitary sewer utilities north of the intersection of State Road 8 and County Road 15. The work includes installation of approximately 1,100 LF of water main, 3 fire hydrants, 1,340 LF of sanitary force main, 50 LF of sanitary gravity sewer, highway crossings (jack and bore), a lift station, and all other work required for the completion of the project. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Garrett |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Road, Government, Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Commercial |
Article published date | 2025-07-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
