SR 8 @ 4 LOCS IN DEKALB
Sector: Telecommunications • Location: Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project will upgrade equipment, accommodate pedestrians, and update pedestrian facilities to meet current ADA standards. The Office of Traffic Operations has justified these upgrade based on the following deficiencies: pedestrian Accommodations, ADA Compliance, old conductor cable, 332 cabinet w/2070, support poles/mast arms, utility issues, and signal interconnect. The locations in this proje
- Status
- Closed
- Sector
- Telecommunications, Power Transmission, Commercial, Road, Power Generation (CCGT), Residential
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 8 @ 4 LOCS IN DEKALB
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will upgrade equipment, accommodate pedestrians, and update pedestrian facilities to meet current ADA standards. The Office of Traffic Operations has justified these upgrade based on the following deficiencies: pedestrian Accommodations, ADA Compliance, old conductor cable, 332 cabinet w/2070, support poles/mast arms, utility issues, and signal interconnect. The locations in this project are: The following intersections are in this project: 1.) SR 8/Ponce de Leon at Springdale Road 2.) SR 8/Ponce de Leon at Oakdale Road 3.) SR 8/Ponce de Leon at Fairview Road 4.) SR 8/Ponce de Leon at Clifton Road |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Power Transmission, Commercial, Road, Power Generation (CCGT), Residential |
Article published date | 2026-03-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
