SR 800/Spanish River Boulevard Over the Intracoastal Waterway Scour Countermeasures
Sector: Water Supply and Storage • Location: Boca Raton, Florida, United States
Source: Boca News Now
This 0.092-mile project on SR 800/Spanish River Boulevard over the Intracoastal Waterway (ICWW) in the City of Boca Raton began on January 9, 2024. Work includes installing Articulated Concrete Block (ACB) at the riverbed to protect the bridge foundations from erosion on the eastbound and westbound SR 800/Spanish River Boulevard bridges.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Under Construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This 0.092-mile project on SR 800/Spanish River Boulevard over the Intracoastal Waterway (ICWW) in the City of Boca Raton began on January 9, 2024. Work includes installing Articulated Concrete Block (ACB) at the riverbed to protect the bridge foundations from erosion on the eastbound and westbound SR 800/Spanish River Boulevard bridges. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
