SR 804/East Ocean Avenue Resurfacing Project
Sector: Road • Location: Boynton Beach, Florida, United States
Source: Boca News Now
This 0.587-mile project on SR 804/East Ocean Avenue from SR 5/US 1/Federal Highway to SR A1A/North Ocean Boulevard in the City of Boynton Beach and the Town of Ocean Ridge is anticipated to begin on March 10, 2025. Work includes milling and repaving the existing roadway within the project limits to ensure long-term infrastructure resilience and safety.
- Status
- Prospective
- Sector
- Road
- Location
- Boynton Beach, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Boca News Now
ConstructChat
Ask ConstructChat about SR 804/East Ocean Avenue Resurfacing Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This 0.587-mile project on SR 804/East Ocean Avenue from SR 5/US 1/Federal Highway to SR A1A/North Ocean Boulevard in the City of Boynton Beach and the Town of Ocean Ridge is anticipated to begin on March 10, 2025. Work includes milling and repaving the existing roadway within the project limits to ensure long-term infrastructure resilience and safety. |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Boynton Beach |
Source
Source | Boca News Now |
URL |
More Details
Record type | Project |
Sector | Road |
Article published date | 2025-03-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
