logo

SR 81 @ DRIED INDIAN CREEK IN COVINGTON

Sector: Car parking • Location: Covington, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed project would construct a replacement bridge carrying SR 81 over Dried Indian Creek. The bridge would be replaced at its existing location. Traffic would be maintained via an off-site detour during construction. Motorists traveling along SR 81 between Covington and Oxford would have to detour around the project location during construction using SR 12, I-20, and SR 162 that is approxi

Project Information FAQ

Project Information

4 Q
The project “SR 81 @ DRIED INDIAN CREEK IN COVINGTON” is an infrastructure initiative in the Car parking sector, located in Covington, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project would construct a replacement bridge carrying SR 81 over Dried Indian Creek. The bridge would be replaced at its existing location. Traffic would be maintained via an off-site detour during construction. Motorists traveling along SR 81 between Covington and Oxford would have to detour around the project location during construction using SR 12, I-20, and SR 162 that is approximately 19.5 miles long. The proposed structure would be approximately 68.0 feet long by 53.42 feet wide. This proposed bridge typical section includes three 12-foot lanes, and a 2-foot shoulder and 5.5-foot sidewalk on both sides. The proposed roadway approaches would consist of three 12-foot lanes, and 30” curb and gutter, 2 foot grass strip, and 5 foot sidewalk on both sides. The replacement bridge is proposed to be skewed approximately 25 degrees from normal to better align the opening with the direction of flow during storm events.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data