logo

SR 82 SPUR @ NORTH OCONNEE RIVER 6.8 MI NORTH OF JEFFERSON

Sector: Cement • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

This bridge (Structure ID 157-0018-0; SR 82 Spur over North Oconee River) was built in 1958. The bridge consists of six spans of reinforced concrete deck girders on concrete caps and concrete columns and steel piles. The design vehicle used for this bridge is below the current design standards. This bridge is currently posted. The overall condition of this bridge would be classified as fair.

Project Information FAQ

Project Information

4 Q
The project “SR 82 SPUR @ NORTH OCONNEE RIVER 6.8 MI NORTH OF JEFFERSON” is an infrastructure initiative in the Cement sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This bridge (Structure ID 157-0018-0; SR 82 Spur over North Oconee River) was built in 1958. The bridge consists of six spans of reinforced concrete deck girders on concrete caps and concrete columns and steel piles. The design vehicle used for this bridge is below the current design standards. This bridge is currently posted. The overall condition of this bridge would be classified as fair. The deck is in fair condition with transverse concrete cracking and spalling. The superstructure is in fair condition with concrete cracking and spalling of beam ends. The substructure is in fair condition with concrete spalls, cracking and scaling at the water line. Due to the structural integrity of the bridge and the restrictive weight limits of the structure replacement is recommended.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data