logo
ProjectConstruction Work Program

SR 83 @ MURDER CREEK

The status, timeline and source of this project. A free account opens every field.

Source: Georgia Department of Transportation (GDOT)

This bridge (Structure ID 159-0009-0; SR 83 over Murder River) was built in 1963. The bridge consists of nine spans of reinforced concrete deck girders (RCDGs) on concrete caps with steel piles. It was designed using an HS-20 vehicle and the calculated load carrying capacity is 44 percent lower than our current standards. This bridge is on the base highway network. The bridge is narrow with no sh

Status
Under Construction
Sector
Automotive, Bridge, Cement, Road, Steel, Government, Metal
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 83 @ MURDER CREEK

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 83 @ MURDER CREEK” is an infrastructure initiative in the Automotive sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This bridge (Structure ID 159-0009-0; SR 83 over Murder River) was built in 1963. The bridge consists of nine spans of reinforced concrete deck girders (RCDGs) on concrete caps with steel piles. It was designed using an HS-20 vehicle and the calculated load carrying capacity is 44 percent lower than our current standards. This bridge is on the base highway network. The bridge is narrow with no shoulders and does not meet current design standards. The current condition of the bridge is fair. There is spalling with exposed rebar on the bottom of the deck. The RCDGs have minor cracks throughout. The steel piles have corrosion and advanced section loss throughout. The concrete caps have moderate cracks in some areas. Due to the condition of this structure, the load carrying capacity and width being below current design standards, and the extent of work needed to bring it up to current standards, replacement of this structure is necessary.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Automotive, Bridge, Cement, Road, Steel, Government, Metal

Article published date

2024-03-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project