SR 83 CONN FROM SR 11 TO SR 83
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project is to construct a new location, 4.7-mile connector that would provide a bypass around the historic downtown City of Monroe. The connector would tie into the existing intersection of James Huff Road and SR 10/US 78. The proposed typical section along the SR 83 Connector would consist of two 12-foot lanes (one travel lane in each direction) with 10-foot outside shoulders (6.5 feet paved
- Status
- Under Construction
- Sector
- Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 83 CONN FROM SR 11 TO SR 83
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is to construct a new location, 4.7-mile connector that would provide a bypass around the historic downtown City of Monroe. The connector would tie into the existing intersection of James Huff Road and SR 10/US 78. The proposed typical section along the SR 83 Connector would consist of two 12-foot lanes (one travel lane in each direction) with 10-foot outside shoulders (6.5 feet paved). At intersection locations, single 12-foot right and left-turn lanes would be provided. The existing segment of SR 83 would remain as a two-lane roadway for approximately 0.73 miles from SR 83 at SR 83 Connector and would remain as a four-lane roadway with 12-foot travel lanes with a combination of a raised and depressed median for approximately 0.48 miles leading to SR 83 at SR 10/US 78. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Road, Government |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
