logo

SR 85 @ CSX #639361Y IN WOODBURY

Sector: Bridge • Location: Woodbury, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The project consists of replacement of the existing bridge over CSX Railroad, Structure ID 199-0035-0 in Woodbury. The bridge will include two 11-foot lanes and 8-foot shoulders. The roadway approaches will include two 11-foot lanes and 8-foot overall shoulders, 4-foot of which is paved. A temporary off-site detour will be used for staging traffic. The temporary detour will utilize State Route 41,

Project Information FAQ

Project Information

4 Q
The project “SR 85 @ CSX 639361Y IN WOODBURY” is an infrastructure initiative in the Bridge sector, located in Woodbury, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of replacement of the existing bridge over CSX Railroad, Structure ID 199-0035-0 in Woodbury. The bridge will include two 11-foot lanes and 8-foot shoulders. The roadway approaches will include two 11-foot lanes and 8-foot overall shoulders, 4-foot of which is paved. A temporary off-site detour will be used for staging traffic. The temporary detour will utilize State Route 41, State Route 173, State Route 85, and State Route 109/State Route 18 and increase route length from 10.3 miles to 12.3 miles, a net length increase of 2.0 miles. The proposed bridge will consist of a 70-foot span, an 80-foot span, and four 70-foot spans and will require raising the vertical alignment approximately 1.25-feet for vertical clearance requirements over the railroad. The proposed project length is 0.6 miles.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data