logo
ProjectComplete

SR 85 @ SR 279

Complete · Georgia

Source: Georgia Department of Transportation (GDOT)

This project proposes to convert mainline Type A median opening to Type B to allow for a protected/permissive operation, increase the SR 85 Northbound left turning storage length to 540 feet and SR 85 Southbound left turning length to 480 feet and assign lagging left turning phase for SR 85 Southbound.

Status
Closed
Sector
Government
Location
Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 85 @ SR 279

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 85 @ SR 279” is an infrastructure initiative in the Government sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

complete

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project proposes to convert mainline Type A median opening to Type B to allow for a protected/permissive operation, increase the SR 85 Northbound left turning storage length to 540 feet and SR 85 Southbound left turning length to 480 feet and assign lagging left turning phase for SR 85 Southbound.

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Government

Article published date

2024-05-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project