SR 85 @ SR 279
Complete · Georgia
Source: Georgia Department of Transportation (GDOT)
This project proposes to convert mainline Type A median opening to Type B to allow for a protected/permissive operation, increase the SR 85 Northbound left turning storage length to 540 feet and SR 85 Southbound left turning length to 480 feet and assign lagging left turning phase for SR 85 Southbound.
- Status
- Closed
- Sector
- Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 85 @ SR 279
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project proposes to convert mainline Type A median opening to Type B to allow for a protected/permissive operation, increase the SR 85 Northbound left turning storage length to 540 feet and SR 85 Southbound left turning length to 480 feet and assign lagging left turning phase for SR 85 Southbound. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
