SR 85 (South Ferdon Boulevard) from PJ Adams Parkway to I-10
Sector: Car parking • Location: Crestview, Florida, United States Of America (USA)
Source: Florida Department of Transportation (FDOT)
This multi-lane reconstruction project consists of widening SR 85 (South Ferdon Boulevard) from four (4) lanes to six (6) lanes from north of PJ Adams Parkway to Mirage Avenue and shall include reconstruction of SR 85 and reconfiguration of the I-10 interchange as a U-Turn Interchange. The overall anticipated project length is 1.06 miles. The proposed typical section as recommended in the PD&E St
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This multi-lane reconstruction project consists of widening SR 85 (South Ferdon Boulevard) from four (4) lanes to six (6) lanes from north of PJ Adams Parkway to Mirage Avenue and shall include reconstruction of SR 85 and reconfiguration of the I-10 interchange as a U-Turn Interchange. The overall anticipated project length is 1.06 miles. The proposed typical section as recommended in the PD&E Study (FPID 220171-2) is an urban 6-lane typical section with a 30’ median, 6’ sidewalk along the eastern right-of-way, and 10’ multiuse path along the western right-of-way. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
