logo

SR 87A Connector from US 90 to CR 191 (Munson Highway)

Sector: Bridge • Location: Milton, Florida, United States Of America (USA)

Source: Florida Department of Transportation (FDOT)

Project
Design

SR 87A Connector from US 90 to Munson Highway: 416748-8: The new construction of SR 87A will primarily consist of a new alignment from south of US 90 to CR 191 (Munson Highway). The SR 87A Connector is proposed to ultimately be a 4-lane, divided highway; however, it is the intent of this project to build a 4-lane facility from the beginning of the project to approximately 2,000’ north of Opportun

Project Information FAQ

Project Information

4 Q
The project “SR 87A Connector from US 90 to CR 191 (Munson Highway)” is an infrastructure initiative in the Bridge sector, located in Milton, Florida, United States Of America (USA). Taiyo aggregates data on it from Florida Department of Transportation (FDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

design

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

SR 87A Connector from US 90 to Munson Highway: 416748-8: The new construction of SR 87A will primarily consist of a new alignment from south of US 90 to CR 191 (Munson Highway). The SR 87A Connector is proposed to ultimately be a 4-lane, divided highway; however, it is the intent of this project to build a 4-lane facility from the beginning of the project to approximately 2,000’ north of Opportunity Drive and then transition to an interim, 2-lane facility for the remainder of the project. A multiuse path is proposed adjacent to the west side of SR 87. This multiuse path will begin at historic SR 1 (Old Spanish Trail) at US 90 and will end by tying into the Blackwater River Heritage State Trail once it crosses over the Blackwater River. This project will also include buffered bicycle lanes within the curbed 4-lane part of the facility, two new bridges over the Blackwater River and floodplain, an upgraded signal at US 90, new signs, and pavement markings. The proposed construction will include acquiring right-of-way for the ultimate 4-lane build out, including stormwater ponds. Travis Justice, Project Manager | 850-814-4692 | tjustice@ceteris.orgSR 87A Connector from Munson Highway to SR 87N: 416748-9: The new construction of SR 87A will primarily consist of a new alignment from east of CR 191 (Munson Highway) to west of SR 87 North. The SR 87A Connector is proposed to ultimately be a 4-lane, divided highway; however, it is the intent of this project to build an interim, 2-lane facility. This project will also include buffered bicycle lanes, a new bridge over Clear Creek and medians, new signs, pavement markings and signalization. The proposed construction will include acquiring right-of-way for the ultimate 4-lane build out and stormwater ponds, drainage improvements, the realignment of Munson Highway/CR 191 at the intersection of SR 87A, and a new connection from SR 87N to SR 89N.Nikole Arrant, FDOT Project Manager | 850-415-9017 | narrant@hntb.comFunding: Neither segment is funded for right-of-way acquisition or construction in the current FDOT Five-Year Work Program.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data