SR 87/MACON FM JOE TAMPLIN EXT TO & ALONG WEAVER RD TO W.ELK
Sector: Car parking • Location: Macon, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
This project will construct auxiliary lanes on SR 87 in Bibb County. The project will reconstruct SR 87/US 23 from an existing four-lane roadway with a 40-ft depressed median with rural shoulders to a four-lane roadway with a 32-ft raised, concrete median (with curb and gutter and sidewalks) throughout the limits of the project. Auxiliary lanes will be constructed to facilitate the efficient mov
- Status
- Closed
- Sector
- Car parking, Cement, Road, Government, Automotive
- Location
- Macon, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 87/MACON FM JOE TAMPLIN EXT TO & ALONG WEAVER RD TO W.ELK
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will construct auxiliary lanes on SR 87 in Bibb County. The project will reconstruct SR 87/US 23 from an existing four-lane roadway with a 40-ft depressed median with rural shoulders to a four-lane roadway with a 32-ft raised, concrete median (with curb and gutter and sidewalks) throughout the limits of the project. Auxiliary lanes will be constructed to facilitate the efficient movement of traffic within the interchange area. Weaver Road will be reconstructed from a two-lane roadway with rural shoulders to a four-lane roadway with a 20-ft raised, concrete median with curb and gutter and sidewalks. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Macon |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Cement, Road, Government, Automotive |
Article published date | 2024-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
