SR 87/US 23 @ SR 26
The status, timeline and source of this project. A free account opens every field.
Source: Georgia Department of Transportation (GDOT)
This project is located at the intersection of SR 26 and SR 87, approximately 0.54 miles north of the city limits of Cochran and approximately 11.82 miles south of the Laurens County line, in Bleckley County. The project proposes to improve the intersection of SR 26 and SR 87. State Route 26 would be widened 6 feet symmetrically to provide a left-turn lane in both directions with additional 12 f
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government
- Location
- Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 87/US 23 @ SR 26
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is located at the intersection of SR 26 and SR 87, approximately 0.54 miles north of the city limits of Cochran and approximately 11.82 miles south of the Laurens County line, in Bleckley County. The project proposes to improve the intersection of SR 26 and SR 87. State Route 26 would be widened 6 feet symmetrically to provide a left-turn lane in both directions with additional 12 foot right-turn lanes. State Route 87 would be widened six feet symmetrically to provide a left turn lane in both directions with additional 12 foot right-turn lanes. The intersection currently operates under stop sign control. The proposed project would install a stop and go traffic signal at the intersection. |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
