logo

SR 89/US 441 @ LITTLE SUWANNEE CREEK 8 MI S OF FARGO

Sector: Bridge • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The project consists of the replacement of an existing bridge on SR 89/US 441 over Little Suwannee Creek in Echols County, located 8 mi south of the city of Fargo, GA. The proposed project begins approx. 768' southwest of the existing bridge and extends northeast approximately 1157', for an approximate length of 1,925' (0.36 mi). Proposed is a new bridge that will be constructed on the existing al

Project Information FAQ

Project Information

4 Q
The project “SR 89/US 441 @ LITTLE SUWANNEE CREEK 8 MI S OF FARGO” is an infrastructure initiative in the Bridge sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the replacement of an existing bridge on SR 89/US 441 over Little Suwannee Creek in Echols County, located 8 mi south of the city of Fargo, GA. The proposed project begins approx. 768' southwest of the existing bridge and extends northeast approximately 1157', for an approximate length of 1,925' (0.36 mi). Proposed is a new bridge that will be constructed on the existing alignment. The proposed bridge length will be 270' long with two 12' lanes and 6' shoulders. The roadway typical section consists of two 12-foot lanes and 10' outside shoulders with 4' paved on each side of the roadway. Design speed of the project will be 55 mph. Traffic will be maintained with a temporary onsite detour.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data