logo

SR 8/Donald Lee Hollowell Parkway

Sector: Manufacturing (Industrial) • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project

A scoping study on SR 8/US 78/US 278/Donald Lee Hollowell Parkway from its interchange with I-285 to the intersection with SR 280/Hamilton E Holmes Drive/James Jackson Parkway. The goal of the scoping study is to identify any transportation needs, and, if necessary, determine what solutions could be implemented on the corridor. Potential Improvements Roundabouts Intersection Improvements Bike Lane

Project Information FAQ

Project Information

4 Q
The project “SR 8/Donald Lee Hollowell Parkway” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A scoping study on SR 8/US 78/US 278/Donald Lee Hollowell Parkway from its interchange with I-285 to the intersection with SR 280/Hamilton E Holmes Drive/James Jackson Parkway. The goal of the scoping study is to identify any transportation needs, and, if necessary, determine what solutions could be implemented on the corridor. Potential Improvements Roundabouts Intersection Improvements Bike Lanes Turn Lanes Additional Through Lanes 2. Traffic Calming PI #0017926 A proposed road diet to reduce SR 8/US 78/US 278/ Donald Lee Hollowell Parkway from four to three lanes (one lane in each direction and a center turn lane), between SR 280/Hamilton E. Holmes Drive/James Jackson Parkway and Stiff Street. Project Newsletter Spring 2023 Summer 2022 3. Scoping Study PI #0019069 A scoping study to identify potential operational improvements at the intersection of SR 8/US 78/US 278/Donald Lee Hollowell Parkway and SR 70/Fulton Industrial Boulevard. The scoping study will help identify any transportation needs at the intersection and determine what intersection improvements could be implemented to address these needs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data