logo

SR 8/SR 316/US 29 @ DIALS MILL ROAD & @ DIALS MILL EXT

Sector: Power Transmission • Location: Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The approved concept report would add an interchange at Dials Mill Rd & SR 316 & close the intersection of Dials Mill Ext. and SR 316. The length of this project is approximately 0.7 miles along SR 316 and 0.6 miles along Dials Mill Rd. A bridge is proposed to accommodate an interchange at Dials Mill Rd. & SR 316. The intersection of Dials Mill Ext. at SR 316 is proposed to be closed. Dials Mill

Project Information FAQ

Project Information

4 Q
The project “SR 8/SR 316/US 29 @ DIALS MILL ROAD & @ DIALS MILL EXT” is an infrastructure initiative in the Power Transmission sector, located in Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The approved concept report would add an interchange at Dials Mill Rd & SR 316 & close the intersection of Dials Mill Ext. and SR 316. The length of this project is approximately 0.7 miles along SR 316 and 0.6 miles along Dials Mill Rd. A bridge is proposed to accommodate an interchange at Dials Mill Rd. & SR 316. The intersection of Dials Mill Ext. at SR 316 is proposed to be closed. Dials Mill Ext. will be realigned to connect to Dials Mill Spur south of SR 316, & a cul-de-sac will be added along Dials Mill Ext. north of SR 316. The intersection of Dials Mill Rd & Dials Mill Ext. is also proposed to be realigned to meet current design standards. This project is approximately one & half miles southeast of the Statham city limits and approximately one-half mile east of the Oconee/Barrow County line. There will be 2 separate offsite detours utilized during construction. One detour will have a duration of approximately 5-6 months & the other detour will be approximately 12-15 months.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data