logo

SR 8/US 29 @ SR 378/BEAVER RUIN ROAD

Sector: Road • Location: Lilburn, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Complete

The project is an intersection improvement in Gwinnett County. This project will improve the operation characteristics of the intersection of SR 8 (Lawrenceville Highway) and Beaver Ruin Road/Arcado Road in Gwinnett County, within the city limits of Lilburn. The project will begin approximately 0.44 miles west of Beaver Ruin Road on SR 8 and extend about 0.29 miles east of Beaver Ruin Road. Beav

Project Information FAQ

Project Information

4 Q
The project “SR 8/US 29 @ SR 378/BEAVER RUIN ROAD” is an infrastructure initiative in the Road sector, located in Lilburn, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

complete

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is an intersection improvement in Gwinnett County. This project will improve the operation characteristics of the intersection of SR 8 (Lawrenceville Highway) and Beaver Ruin Road/Arcado Road in Gwinnett County, within the city limits of Lilburn. The project will begin approximately 0.44 miles west of Beaver Ruin Road on SR 8 and extend about 0.29 miles east of Beaver Ruin Road. Beaver Ruin Road north of SR 8 and Lester Road south of SR 8 will also require some reconstruction as part of the project. The work will include placing a median on SR 8 in place of the current two-way left turn lane and increasing the number of left turn lanes at the intersection. SR 8 currently has 4 lanes; two in each direction and a center turn lane. The road will remain four lanes. The signals at Postal Way, Beaver Ruin Road/ Arcado Road and the Kroger Entrance will be upgraded as part of the project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data