logo

SR 8/US 29 @ SR 42 - SCOPING PHASE

Sector: Power Transmission • Location: Atlanta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed improvement would extend the WB left turn lane on SR 8/Ponce De Leon Ave to have 160’ of storage, add a WB right turn lane on SR 8/Ponce De Leon Ave with 100’ of storage, and lastly, it would add a SB right turn lane on SR 42/Moreland Ave. Widening would be required on the SB and WB approaches to allow for the added right turn lanes. Additional right of way would also be required on t

Status
Under Construction
Sector
Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
Location
Atlanta, Georgia, United States of America
Updated
22 Jul 2026
Source
Georgia Department of Transportation (GDOT)

ConstructChat

Ask ConstructChat about SR 8/US 29 @ SR 42 - SCOPING PHASE

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SR 8/US 29 @ SR 42 - SCOPING PHASE” is an infrastructure initiative in the Power Transmission sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Participants

Sponsoring Agency

Status

Original status

construction work program

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed improvement would extend the WB left turn lane on SR 8/Ponce De Leon Ave to have 160’ of storage, add a WB right turn lane on SR 8/Ponce De Leon Ave with 100’ of storage, and lastly, it would add a SB right turn lane on SR 42/Moreland Ave. Widening would be required on the SB and WB approaches to allow for the added right turn lanes. Additional right of way would also be required on the WB approach. A retaining wall would need to be constructed and a utility pole, a signal pole, and a drainage structure on the north-east corner of the intersection would need to be relocated. This improvement would allow for increased WB left turn storage and better service for the WB and SB right turns. Other alternatives considered include constructing a multilane roundabout and adding a WB right turn lane on SR 8/Ponce De Leon A, extending WB left turn lane, without adding a SB right turn lane on SR 42/Moreland Ave.

Location

Country

United States of America (USA)

State

Georgia

City

Atlanta

Source

Source

Georgia Department of Transportation (GDOT)

URL

More Details

Record type

Project

Sector

Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project