SR 8/US 29 @ SR 42 - SCOPING PHASE
Sector: Power Transmission • Location: Atlanta, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The proposed improvement would extend the WB left turn lane on SR 8/Ponce De Leon Ave to have 160’ of storage, add a WB right turn lane on SR 8/Ponce De Leon Ave with 100’ of storage, and lastly, it would add a SB right turn lane on SR 42/Moreland Ave. Widening would be required on the SB and WB approaches to allow for the added right turn lanes. Additional right of way would also be required on t
- Status
- Under Construction
- Sector
- Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment
- Location
- Atlanta, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about SR 8/US 29 @ SR 42 - SCOPING PHASE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | construction work program |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed improvement would extend the WB left turn lane on SR 8/Ponce De Leon Ave to have 160’ of storage, add a WB right turn lane on SR 8/Ponce De Leon Ave with 100’ of storage, and lastly, it would add a SB right turn lane on SR 42/Moreland Ave. Widening would be required on the SB and WB approaches to allow for the added right turn lanes. Additional right of way would also be required on the WB approach. A retaining wall would need to be constructed and a utility pole, a signal pole, and a drainage structure on the north-east corner of the intersection would need to be relocated. This improvement would allow for increased WB left turn storage and better service for the WB and SB right turns. Other alternatives considered include constructing a multilane roundabout and adding a WB right turn lane on SR 8/Ponce De Leon A, extending WB left turn lane, without adding a SB right turn lane on SR 42/Moreland Ave. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Atlanta |
Source
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Government, Power Generation (CCGT), Manufacturing (Industrial), Waste Processing and Treatment |
Article published date | 2024-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
