logo

SR 8/US 29 @ SR 42 - SCOPING PHASE

Sector: Power Transmission • Location: Atlanta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Construction Work Program

The proposed improvement would extend the WB left turn lane on SR 8/Ponce De Leon Ave to have 160’ of storage, add a WB right turn lane on SR 8/Ponce De Leon Ave with 100’ of storage, and lastly, it would add a SB right turn lane on SR 42/Moreland Ave. Widening would be required on the SB and WB approaches to allow for the added right turn lanes. Additional right of way would also be required on t

Project Information FAQ

Project Information

4 Q
The project “SR 8/US 29 @ SR 42 - SCOPING PHASE” is an infrastructure initiative in the Power Transmission sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

construction work program

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed improvement would extend the WB left turn lane on SR 8/Ponce De Leon Ave to have 160’ of storage, add a WB right turn lane on SR 8/Ponce De Leon Ave with 100’ of storage, and lastly, it would add a SB right turn lane on SR 42/Moreland Ave. Widening would be required on the SB and WB approaches to allow for the added right turn lanes. Additional right of way would also be required on the WB approach. A retaining wall would need to be constructed and a utility pole, a signal pole, and a drainage structure on the north-east corner of the intersection would need to be relocated. This improvement would allow for increased WB left turn storage and better service for the WB and SB right turns. Other alternatives considered include constructing a multilane roundabout and adding a WB right turn lane on SR 8/Ponce De Leon A, extending WB left turn lane, without adding a SB right turn lane on SR 42/Moreland Ave.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data