logo

SR 8/US 29 FROM CS 520/BOULEVARD DR/MONROE DR TO SR 10 - LCI

Sector: Commercial • Location: Atlanta, Georgia, United States of America

Source: Georgia Department of Transportation (GDOT)

Project
Under Construction

The project will address sidewalk improvements. It will include installation of a furniture zone with street trees & pedestrian scale lighting between Monroe Dr/Blvd & Glen Iris Dr & between Ponce de Leon Place & Freedom Pkwy. Additional proposed features include raised medians between Midtown Place Shopping Center & Ponce de Leon Court & at the Freedom Pkwy intersection. A ramp & retaining wall

Project Information FAQ

Project Information

4 Q
The project “SR 8/US 29 FROM CS 520/BOULEVARD DR/MONROE DR TO SR 10 - LCI” is an infrastructure initiative in the Commercial sector, located in Atlanta, Georgia, United States of America. Taiyo aggregates data on it from Georgia Department of Transportation (GDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will address sidewalk improvements. It will include installation of a furniture zone with street trees & pedestrian scale lighting between Monroe Dr/Blvd & Glen Iris Dr & between Ponce de Leon Place & Freedom Pkwy. Additional proposed features include raised medians between Midtown Place Shopping Center & Ponce de Leon Court & at the Freedom Pkwy intersection. A ramp & retaining wall system will be constructed on the back side of the existing CVS located in the Midtown Place shopping center. A staircase/retaining wall system will be constructed on the northwest corner of the Atlanta BeltLine Ponce de Leon overpass. The stair will be constructed against the existing Paris on Ponce building, with a retaining wall system to the west.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data