logo

SR 9 - Unnamed Tributary to Pilchuck Creek - Fish Passage - Complete Summer 2022

Sector: Water Supply and Storage • Location: Washington, United States of America

Source: Washington State Department of Transportation (WSDOT)

Project
Completed

A culvert that runs under State Route 9 at milepost 34.7, south of Lake McMurray near the North Centennial Trail Trailhead, was failing and needed to be replaced. The bottom of the culvert had rusted away, which resulted in water washing away the side of the road. This caused a sinkhole on the shoulder that was repaired in April 2018 and could have caused further problems in the future. Contractor

Project Information FAQ

Project Information

5 Q
The project “SR 9 - Unnamed Tributary to Pilchuck Creek - Fish Passage - Complete Summer 2022” is an infrastructure initiative in the Water Supply and Storage sector, located in Washington, United States of America. Taiyo aggregates data on it from Washington State Department of Transportation (WSDOT).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

A culvert that runs under State Route 9 at milepost 34.7, south of Lake McMurray near the North Centennial Trail Trailhead, was failing and needed to be replaced. The bottom of the culvert had rusted away, which resulted in water washing away the side of the road. This caused a sinkhole on the shoulder that was repaired in April 2018 and could have caused further problems in the future. Contractor crews working for WSDOT closed the highway for several days to dig up the old culvert and replace it during fall 2021.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data